How does the ADU or remodel design process work at Zeus Design Build?
- Initial Consultation:
The process often begins with an initial consultation between the homeowner and the design/build team. During this meeting, you can discuss your goals, requirements, and budget for the ADU or other type of remodel project.
- Site Assessment:
The design team will visit your property to assess the site’s characteristics, including available space, zoning regulations, and any potential challenges.
- Design Concept:
The design team will work with you to create a preliminary design concept that includes floor plans, architectural drawings, and an overall vision for the ADU, kitchen, etc.
- Detailed Design and Planning:
Once the initial concept is approved, the design team will develop detailed construction plans, including structural, electrical, and plumbing specifications. They will also consider any necessary permits and code compliance.
- Permitting:
Obtaining the necessary permits from local authorities is a crucial step in the process. The design/build team will typically handle the permitting process on your behalf.
- Construction:
After receiving permits, construction of the ADU or remodel will begin. This includes site preparation, foundation work, framing, roofing, electrical, plumbing, and all other aspects of construction.
- Quality Control and Inspections:
Throughout the construction process, there will be quality control measures and inspections to ensure the project adheres to building codes and industry standards.
- Interior Finishing:
The interior finishes, such as flooring, cabinetry, fixtures, and paint, will be completed to your specifications.
- Hand Over The Keys :
Once the ADU or other remodel is complete and approved, it will be handed over to you, and you can begin using the space for its intended purpose.